A contractor demobilising from the Tilenga Project needed containers and site equipment moved between camps and supply bases in Buliisa. We supplied flatbed trailers and a mobile crane with the operators and drivers to run them, and the contractor brought us back for a second phase.
A scope confirmed in writing, a lift plan or route plan where the job needs one, machine inspection records and operator certificates sent ahead for your HSE team, and an itemised quote
Daily pre-use checks on every machine, a daily vehicle checklist on every truck, toolbox talks recorded, and a signed delivery or movement note for each load with its condition at collection
Records closed out and filed against the asset, so the next inspection interval, service and job history all sit in one place. Ready when your HSE team, insurer or a regulator asks.
The same discretion applies to your job.
The project, the district, the kind of work, and the services and equipment classes it used.
Client correspondence, internal site and camp names, dates, the quantities of equipment on site, and the people involved.
Letters from past clients go to procurement teams on request.
A photo of the load and of the ground where the machine has to stand answers most of our first questions.