Lifting appliances and lifting gear registered and thoroughly examined by an authorised person, with the register kept and available.
We get a Ministry of Works and Transport permit before the trip for loads over the permitted height, width or length.
Our crews work inside your permit system. Nothing is lifted in a substation without the site authority's release.
Weight, radius, ground bearing, slinging arrangement and exclusion zone set out before mobilisation, and a lift supervisor on site for the pick.
Operator, rigger and banksman certificates sent ahead for your review.
Send the unit weight and dimensions, where it is coming from, where it has to land and what the access is like. We will come back with the transport and the crane the job needs, quoted line by line.