Crane selection, load and radius checks, ground bearing pressure calculations, rigging arrangement and lift studies.
The lift plan, the method statement and the risk assessment, and overall responsibility for how the lifting operation is planned and managed.
Trailer configuration, axle loading, route survey, bridge and clearance checks, and the case that goes with a special load permit application.
Sequencing, resource planning and method for a multi-lift or multi-move scope.
The load
The site
The scope
The crane
The output you need
Whose approval it has to pass
When
That is usually enough to start. Tell us what the plan has to be approved by and when. Are you a lift engineer or planner? Join our personnel network.
Josephine House, 2nd Floor, Kayunga–Bugerere Road, Mukono. P.O. Box 152539, Kampala, Uganda.
Cookie preferences